Substation Scout

Glen Gardner substations

Named in 1 PJM planning document for 1 project, on October 8, 2024.

Existingdescribed as
JCPLzone
—kV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Gilbert and Glen Gardner Substations
JCPL-2023-047 · s3257.1
Not printed $5.2M 04/04/2025 Not printed 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 29
Gilbert and Glen Gardner Substations “Replace limiting substation equipment at Gilbert and Glen Gardner substations to meet or exceed the line (V1036) conductor rating”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this