Speedway #2
Named in 1 project in the 2025 GA ITS Ten-Year Plan (2026-2035).
Described as new. The quoted wording calls this substation new. “Speedway 230 kV Substation: Construction of a new substation in Henry County that will serve this new data customer on the customer’s property.” — Georgia Power, Hills Bridge–Speedway 500 kV Transmission Project page, retrieved 2026-11-20
The plan names Speedway #1 and Speedway #2 as the ends of two new 230kV lines (TEAMS 21332). Georgia Power's page describes the Speedway 230 kV substation as new in one sentence and draws two stations, "Speedway #1 Sub" and "Speedway #2 Sub", on its map; the sentence is quoted for both.
The plan prints no county for this substation, and no utility project page found names one for it.
Location
33.3843, -84.3537 · Henry County, GA · view on a map
Point published by the utility. The utility publishes this point, on a project map or in a filing. Accurate to about ±300 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Georgia Power's Hills Bridge–Speedway project page prints its map configuration in the page source, with a substation outline labelled "Speedway #2 Sub"; the point is the mean of that outline's vertices. The page marks the map "MAP NOT BASED ON FIELD SURVEY DATA ... Pre-Engineering data", so ±300 m.
Note: Georgia Power's text names one "Speedway 230 kV Substation"; its map and the plan ("Speedway #1 and Speedway #2") show two. The tracker splits them (2026-11-20).
County: the Census county at this point.
Sources: Georgia Power, Hills Bridge–Speedway 500 kV Transmission Project page (n/a (retrieved 2026-11-20)), About the Project; Project Map · 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.122. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| CC - PROJECT SPEEDWAY (NETWORK IMPROVEMENTS) Construct a new 500/230kV substation and loop in the Ohara - Scherer 500kV line. Install two 500/230kV auto transformers and build two new 1-mile 230kV lines each to Speedway #1 and Speedway #2, utilizing 200C 1351 ACSS Martin. TEAMS 21332 · plan p.122 · zone 208 |
GPC | In the plan p.10 |
Jun 1, 2027 | New project | Hills Bridge, Ohara, Scherer, Speedway #1, Speedway #2 |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.