Speedway #1

Named in 1 project in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
230kV in the quote
GPCproject sponsor
1projects in the plan

Described as new. The quoted wording calls this substation new. “Speedway 230 kV Substation: Construction of a new substation in Henry County that will serve this new data customer on the customer’s property.” — Georgia Power, Hills Bridge–Speedway 500 kV Transmission Project page, retrieved 2026-11-20

The plan names Speedway #1 and Speedway #2 as the ends of two new 230kV lines (TEAMS 21332). Georgia Power's page describes the Speedway 230 kV substation as new in one sentence and draws two stations, "Speedway #1 Sub" and "Speedway #2 Sub", on its map; the sentence is quoted for both.

The plan prints no county for this substation, and no utility project page found names one for it.

Location

33.3730, -84.3418 · Henry County, GA · view on a map

Point published by the utility. The utility publishes this point, on a project map or in a filing. Accurate to about ±300 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Georgia Power's Hills Bridge–Speedway project page prints its map configuration in the page source, with a substation outline labelled "Speedway #1 Sub"; the point is the mean of that outline's vertices. The page marks the map "MAP NOT BASED ON FIELD SURVEY DATA ... Pre-Engineering data", so ±300 m.

Note: Georgia Power's text names one "Speedway 230 kV Substation"; its map and the plan ("Speedway #1 and Speedway #2") show two. The tracker splits them (2026-11-20).

County: the Census county at this point.

Sources: Georgia Power, Hills Bridge–Speedway 500 kV Transmission Project page (n/a (retrieved 2026-11-20)), About the Project; Project Map · 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.122. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
CC - PROJECT SPEEDWAY (NETWORK IMPROVEMENTS)
Construct a new 500/230kV substation and loop in the Ohara - Scherer 500kV line. Install two 500/230kV auto transformers and build two new 1-mile 230kV lines each to Speedway #1 and Speedway #2, utilizing 200C 1351 ACSS Martin.
TEAMS 21332 · plan p.122 · zone 208
GPC In the plan
p.10
Jun 1, 2027 New project Hills Bridge, Ohara, Scherer, Speedway #1, Speedway #2

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.