Jonesboro
Named in 2 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).
—county (not printed)
—kV in the quote
GPCproject sponsor
2projects in the plan
The plan prints no county for this substation, and no utility project page found names one for it.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| HAMPTON AREA 115 TO 230kV LINE CONVERSIONS Convert Hampton – Ohara 115kV and Jonesboro – Ohara 115kV to create a new Jonesboro – Hampton 230kV line. Convert Hampton – South Griffin 115kV to 230kV operation. Loop in Jonesboro - Ohara 115kV through Bonanza so it is not radial. Install a new 230/115kV auto transformer at Jonesboro. TEAMS 21566 · plan p.169 · zone 208 |
GPC | In the plan p.13 |
Jun 1, 2028 | New project | Hampton, Jonesboro, Ohara, South Griffin |
| JONESBORO - MORROW RELAY PROTECTION UPGRADE Upgrade the Jonesboro - Morrow 115kV line relay protection schemes. TEAMS 21573 · plan p.58 · zone 208 |
GPC | In the plan p.9 |
Mar 1, 2027 | New Project | Jonesboro, Morrow |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.