South Griffin

Named in 5 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
—kV in the quote
GPC, GTC, MEAGproject sponsor
5projects in the plan

The plan prints no county for this substation, and no utility project page found names one for it.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
GTC: BARNESVILLE - BIG SOUTH GRIFFIN 230kV PROJECT
Construct a new 19 miles, 230kV line from South Griffin substation - Barnesville Primary substation with 200C 1351 ACSS conductor.
TEAMS 08458 · plan p.200 · zone 213
GTC In the plan
p.15
Jun 1, 2029 Delayed from 2028 to 2029 BARNESVILLE, Barnesville Primary, Big South Griffin, South Griffin
GTC: MCDONOUGH - SOUTH GRIFFIN 115kV REBUILD
In 2028, rebuild 5.8 miles from McDonough to Locust Grove to Luella Jct using 200C 1351 ACSS Martin. Replace all limiting elements including switches and jumpers.
TEAMS 21282 · plan p.165 · zone 208
GTC In the plan
p.13
Jun 1, 2028 New project MCDONOUGH, South Griffin
HAMPTON AREA 115 TO 230kV LINE CONVERSIONS
Convert Hampton – Ohara 115kV and Jonesboro – Ohara 115kV to create a new Jonesboro – Hampton 230kV line. Convert Hampton – South Griffin 115kV to 230kV operation. Loop in Jonesboro - Ohara 115kV through Bonanza so it is not radial. Install a new 230/115kV auto transformer at Jonesboro.
TEAMS 21566 · plan p.169 · zone 208
GPC In the plan
p.13
Jun 1, 2028 New project Hampton, Jonesboro, Ohara, South Griffin
MEAG: BIG SOUTH GRIFFIN 230/115kV SUBSTATION
Build a new 230/115kV substation and relocate all lines except for the South Coweta and Griffin #1 115kV lines from the existing South Griffin substation. Terminate the newly converted Hampton - South Griffin 230kV line. Install two 230/115kV auto transformers.
TEAMS 21568 · plan p.175 · zone 208
MEAG In the plan
p.13
Jun 1, 2028 New project Big South Griffin, Hampton, South Griffin
GTC: OHARA - SOUTH GRIFFIN 230kV LINE RECONDUCTOR
Reconductor 23 miles of the Ohara - South Griffin 230kV line section using 200C 1351 ACSS Martin.
TEAMS 21594 · plan p.209 · zone 208
GTC In the plan
p.16
Jun 1, 2029 New project Ohara, South Griffin

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.