Named in 9 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
—kV in the quote
GPCproject sponsor
9projects in the plan

The plan prints no county for this substation, and no utility project page found names one for it.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
CC - STONEWALL TELL ROAD
Build a 4 miles 230kV line segment, using 200C 1351 ACSS Martin conductor, to loop in the Stonewall Tell Road station into the East Point - Union City 230kV (White) line.
TEAMS 20216 · plan p.91 · zone 208
GPC In the plan
p.7
Jun 1, 2026 No change East Point, Stonewall Tell Road, Union City
EAST POINT RELAY MODERNIZATION
Upgrade protection on 230kV buses, 115kV buses, and 230/115kV auto transformer at the East Point station. Add adequate monitoring on DC supply.
TEAMS 20491 · plan p.50 · zone 208
GPC In the plan
p.7
Jun 1, 2026 No Change East Point
EAST POINT - UNION CITY (WHITE) 230kV REBUILD
Rebuild 4.5 miles of 230kV line on the East Point - Union City 230kV (White) line with 200C 1351.5 ACSS Martin
TEAMS 20690 · plan p.304 · zone 208
GPC In the plan
p.22
May 1, 2035 Delayed from 2031 to 2035 East Point, Union City
EAST POINT - TRIBUTARY 230kV REBUILD
Reconductor the 4.2 miles section from Cavender Drive to Tributary with bundled C7 Everglades conductor on the East Point - Tributary 230kV line.
TEAMS 21097 · plan p.239 · zone 201
GPC In the plan
p.18
Jun 1, 2030 No change East Point, Tributary
EAST POINT - MORROW 115kV REBUILD
Rebuild a 3 miles section of the East Point - Morrow 115kV line, 1.4 mile from East Point to College Point Tap and 1.5 mile from Morrow to Forest Park with 200C 1351 ACSS Martin. Also rebuild portions of Morrow - Mountain View and East Point - Mountain View 115kV lines.
TEAMS 21303 · plan p.306 · zone 208
GPC In the plan
p.22
Jun 1, 2035 New project East Point, Morrow, Mountain View
EAST POINT SWITCH REPLACEMENT
At East Point, replace the switches and jumpers associated with the East Point - Tributary 230kV line with higher rated equipment.
TEAMS 21304 · plan p.240 · zone 208
GPC In the plan
p.18
Jun 1, 2030 New project East Point, Tributary
EAST POINT - MOUNTAIN VIEW 115kV REBUILD
Rebuild a portion of the East Point - Mountain View 115kV line, approximately 2.4 miles of 100C 397.5 ACSR between East Point - College Park # 3 Junction using 200C 1351 ACSS Martin.
TEAMS 21335 · plan p.291 · zone 208
GPC In the plan
p.21
Jun 1, 2033 New project East Point, Mountain View
ADAMSVILLE – EAST POINT 230kV UPGRADE AND LIMITING ELEMENTS REPLACEMENT
Upgrade the Adamsville - East Point 230kV line to 100C. At East Point, replace vendor rated adaptor and (2) 230kV switches with higher rated switches.
TEAMS 21598 · plan p.285 · zone 208
GPC In the plan
p.21
Jun 1, 2032 New project Adamsville, East Point
EAST POINT - MORROW 115kV LIMITING ELEMENTS REMOVAL
Remove limiting elements at the substation terminals for the East Point - Morrow 115kV lines. This involves upgrading associated switches and jumpers with higher rated equipment.
TEAMS 21628 · plan p.195 · zone 208
GPC In the plan
p.15
Jun 1, 2029 New project East Point, Morrow

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first