Tributary
Named in 3 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).
—county (not printed)
—kV in the quote
GPCproject sponsor
3projects in the plan
The plan prints no county for this substation, and no utility project page found names one for it.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| EAST POINT - TRIBUTARY 230kV REBUILD Reconductor the 4.2 miles section from Cavender Drive to Tributary with bundled C7 Everglades conductor on the East Point - Tributary 230kV line. TEAMS 21097 · plan p.239 · zone 201 |
GPC | In the plan p.18 |
Jun 1, 2030 | No change | East Point, Tributary |
| BUZZARD ROOST - TRIBUTARY 230kV REBUILD Rebuild the 2.8 miles Tributary - Thornton Road 230kV line with 200C 1351 ACSS Martin. TEAMS 21098 · plan p.234 · zone 201 |
GPC | In the plan p.17 |
Jun 1, 2030 | No change | Buzzard Roost, Thornton Road, Tributary |
| EAST POINT SWITCH REPLACEMENT At East Point, replace the switches and jumpers associated with the East Point - Tributary 230kV line with higher rated equipment. TEAMS 21304 · plan p.240 · zone 208 |
GPC | In the plan p.18 |
Jun 1, 2030 | New project | East Point, Tributary |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.
Site Scanner