Tributary

Named in 3 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
—kV in the quote
GPCproject sponsor
3projects in the plan

The plan prints no county for this substation, and no utility project page found names one for it.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
EAST POINT - TRIBUTARY 230kV REBUILD
Reconductor the 4.2 miles section from Cavender Drive to Tributary with bundled C7 Everglades conductor on the East Point - Tributary 230kV line.
TEAMS 21097 · plan p.239 · zone 201
GPC In the plan
p.18
Jun 1, 2030 No change East Point, Tributary
BUZZARD ROOST - TRIBUTARY 230kV REBUILD
Rebuild the 2.8 miles Tributary - Thornton Road 230kV line with 200C 1351 ACSS Martin.
TEAMS 21098 · plan p.234 · zone 201
GPC In the plan
p.17
Jun 1, 2030 No change Buzzard Roost, Thornton Road, Tributary
EAST POINT SWITCH REPLACEMENT
At East Point, replace the switches and jumpers associated with the East Point - Tributary 230kV line with higher rated equipment.
TEAMS 21304 · plan p.240 · zone 208
GPC In the plan
p.18
Jun 1, 2030 New project East Point, Tributary

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.