Substation Scout

Prong Moss

Named in 6 listed projects in ERCOT’s transmission project tracking workbook, in Howard County. First named in the release with data as of June 1, 2024.

Howardcounty as printed
138, 345kV
ONCORutility
6projects listed

Described as new. The quoted wording calls this substation new. “new Prong Moss 345/138-kV substation” — project 98873 description, as the utility reported it

Reported complete. Project 81270 is on the Completed tab (actual in-service 2025-12), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Howard, TX: ERCOT queue, 17 active of 19. Same county, not the same substation.

Location

32.1935, -101.3828 · Howard County, TX · view on a map

Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±300 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Symbol anchored: the white switch symbol labelled 'Prong Moss Switch' on Oncor's Ranger Camp Switch to Midland East Switch 345 kV open-house overview board (preliminary, aerial basemap). The map draws the symbol on the Ranger Camp - Midland East corridor exactly where the existing line from the north (toward Falcon Seaboard) meets it. In OpenStreetMap that meeting point is the node shared by three 345 kV ways: from Morgan Creek (way 172246751), to Midland East (way 172246804) and to Falcon Seaboard (way 172246847), at 32.19345,-101.38283; the point is that node. Cross-check: a two-point fit on the corridor's two bends east of the switch (OSM way 172246751 vertices 32.20692,-101.32169 and 32.24792,-101.25202; ~0.21 km/px at 144 dpi) puts the symbol at 32.1926,-101.3813, 0.17 km from the node. +/- ~300 m.

Note: The 345 kV switch (TPIT 81270) is on the Completed tab, in service 2025-12; the 345/138 kV substation addition (98873, Permian Basin Reliability Plan) is planned for 2027-05. TPIT does not say the 138 kV yard is at the same site as the switch; this record assumes the one named station. TPIT 98875 renames Elbow as Redberry ('Redberry (fka Elbow)'). The point is 29.0 mi (straight line) from Morgan Creek and 6.1 mi from Falcon Seaboard, against ERCOT's 'approximately 29.4' and '7.0' miles.

Sources: Oncor, Ranger Camp Switch to Midland East Switch 345 kV Transmission Line Project, open-house overview board (preliminary) (2026), p.1 · ERCOT, Oncor West Texas 345-kV Infrastructure Rebuild RPG Project (Board item 12.2) (2024-06-11), scope list · ERCOT TPIT, projects 81270, 81299, 98873, 98875, 98878, 99243 (release 39, 2026-10-01) · OpenStreetMap: 345 kV ways 172246751, 172246804, 172246847; Falcon Seaboard and Morgan Creek substations (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Construct the new Prong Moss 345 kV switch
Construct a new 345 kV switch
ERCOT project 81270 · utility no. R3025 · RPG 23RPG029
ONCOR
Tier 1
In-Service
Completed tab
345 Dec 2025
actual 2025-12
Prong Moss to Prong Moss
Howard County
Prong Moss
Ranger Camp – Prong Moss 345 kV Line Rebuild
Rebuild the existing 345 kV line and add a second circuit to the new line
ERCOT project 81299 · utility no. R3025 · RPG 23RPG029
ONCOR
Tier 1
Planned
Future tab
345 Jun 2027 Ranger Camp to Prong Moss
Mitchell / Howard County
Ranger Camp, Prong Moss
Prong Moss 345-138 kV auto-transformers and 138 kV Switch
Add Permian Basin Reliability Plan Upgrade ID L20A, L20B and L20D Establish a new Prong Moss 345/138-kV substation and install two new 345/138-kV transformers. Loop the existing Elbow - Bulldog 138-kV line into Prong Moss. Loop the existing Hill Crest - McDonald Road 138-kV line into Prong Moss
ERCOT project 98873 · utility no. R8661
ONCOR
Tier 3
Planned
Future tab
138 May 2027 Prong Moss to Prong Moss
Howard County
Prong Moss
Redberry (fka Elbow) - Prong Moss 138 kV Line Rebuild
Add Permian Basin Reliability Plan Upgrade ID L20C Upgrade the existing Redberry (fka Elbow) - Prong Moss 138-kV line
ERCOT project 98875 · utility no. PB_L20_C
ONCOR
Tier 3
Planned
Future tab
138 May 2027 Elbow to Prong Moss
Howard County
Elbow, Prong Moss
Chalk 69 kV Substation Conversion to 138 kV
Add Permian Basin Reliability Plan Upgrade ID L20G. Construct a new Chalk 138-kV substation at the existing Chalk 69-kV substation and loop the existing McDonald Road – Navigation 138-kV line into Chalk
ERCOT project 98878 · utility no. PB_L20_G
ONCOR
Tier 3
Planned
Future tab
138 Dec 2027 Prong Moss to McDonald Road
Howard / Glasscock County
Prong Moss, McDonald Road
Big Spring - Signal Mountain 69 kV Conversion to 138 kV
Add Permian Basin Reliability Plan Upgrade ID L20E and L20F. Convert the existing Big Spring - Signal Mountain 69-kV line to 138-kV. Connect Signal Mountain to Prong Moss.
ERCOT project 99243 · utility no. PB_L20_E_F
ONCOR
Tier 3
Planned
Future tab
— May 2029 Big Spring to Prong Moss
Howard County
Big Spring, Prong Moss

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
February 1, 202681270Moved between tabsCurrent-year planned → Completed
February 1, 202681270Status as reportedPlanned → In-Service
February 1, 202681299Projected in-service dateMay 2027 → Jun 2027
October 1, 202598873First listedon the Future tab
October 1, 202598875First listedon the Future tab
October 1, 202598878First listedon the Future tab
October 1, 202599243First listedon the Future tab
June 1, 202581270Moved between tabsFuture → Current-year planned
February 1, 202581299Projected in-service dateDec 2026 → May 2027
June 1, 202481270First listedon the Future tab
June 1, 202481299First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first