Substation Scout

Howard, TX interconnection queue

17 active projects totalling 2,479.6 MW in the ERCOT queue.

17active projects
2,479.6active MW
17total filed
Queue IDProjectkVMWResourceStatus
29INR0019 Infinium Solar 345 401.6 Solar SS Completed, FIS Started, No IA
22INR0347 Crater BESS 345 310.3 Battery SS Completed, FIS Started, No IA
26INR0301 Bhalu Storage 138 205.5 Battery SS Completed, FIS Started, No IA
25INR0338 Les Energy Storage 138 205.1 Battery SS Completed, FIS Completed, No IA
25INR0629 Midland Energy Storage 345 204.7 Battery SS Completed, FIS Started, No IA
26INR0485 Prospector Energy Storage 138 204.6 Battery SS Completed, FIS Started, No IA
25INR0611 Odessa Energy Storage 345 202.8 Battery SS Completed, FIS Started, No IA
29INR0177 Rattlesnake Gap Wind SLF 138 200 Wind SS Completed, FIS Started, No IA
27INR0323 Prairie Blossom Storage 138 122.5 Battery SS Completed, FIS Started, No IA
27INR0325 Calf Creek Storage 138 103.3 Battery SS Completed, FIS Started, No IA
25INR0106 Luthor Solar 138 101 Solar SS Completed, FIS Started, No IA
25INR0143 Ariji BESS 138 100.3 Battery SS Completed, FIS Completed, IA
28INR0419 PRI Solar 345 63.8 Solar SS Completed, FIS Started, No IA
27INR0512 Silver Hills Windpower 138 54.1 Wind SS Completed, FIS Started, No IA
19INR0174 Elbow Creek repower 345 0 Wind SS Completed, FIS Completed, IA
29INR0178 Rattlesnake Gap Solar SLF 138 0 Solar SS Completed, FIS Started, No IA
29INR0179 Rattlesnake Gap Storage SLF 138 0 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.