Gibbons Creek
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.
No HIFLD substation record has this name in this county (a record of the same name exists in another county).
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| This models upgrades required for a proposed load addition Install new 345 kV CEHE-owned sub. Loop on 345 kV Zenith to Gibbons Creek Ckt.18 & 50 ERCOT project 110086A |
CNP Tier 4 |
Conceptual Future tab |
345 | Jul 2028 | Becker to Zenith/Gibbons Creek Harris County |
Becker, Zenith, Gibbons Creek |
| This models upgrades required for a proposed load addition Install new customer 345 kV sub. Loop into new 345 kV CEHE sub with two leads each 3.6 miles. ERCOT project 110086B |
CNP Tier 4 |
Conceptual Future tab |
345 | Jul 2028 | NEWSUB to Zenith/Gibbons Creek Harris County |
Zenith, Gibbons Creek |
| Additional Facility Ratings Methodology Phase 2 (FRM2) Substation Upgrades. Upgrade Ckt.50B Zenith to Gibbons Creek to increase thermal limits as part of FRM2 upgrades. ERCOT project 99791A |
CNP Tier 4 |
Planned Current-year planned tab |
345 | Nov 2026 | Zenith to Gibbons Creek Grimes / Harris County |
Zenith, Gibbons Creek |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 99791A | Projected in-service date | Jun 2026 → Nov 2026 |
| July 13, 2026 | 110086A | First listed | on the Future tab |
| July 13, 2026 | 110086B | First listed | on the Future tab |
| July 13, 2026 | 99791A | Projected in-service date | May 2026 → Jun 2026 |
| June 1, 2026 | 99791A | Moved between tabs | Future → Current-year planned |
| June 1, 2026 | 99791A | Projected in-service date | Oct 2029 → May 2026 |
| October 1, 2025 | 99791A | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.