Singleton
Named in 6 listed projects in ERCOT’s transmission project tracking workbook, in Grimes County. First named in the release with data as of October 1, 2022.
A HIFLD substation record has the same name and county: SINGLETON (GRIMES County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Grimes, TX: ERCOT queue, 16 active of 18 · MISO queue, 1 active of 4. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| This models upgrades required for a proposed load addition Install one 300 MVAR capacitor bank at 345 kV NewSub. Install one 300 MVAR capacitor bank at 345 kV Singleton. ERCOT project 110057B |
CNP Tier 4 |
Conceptual Future tab |
345 | Jul 2029 | NewSub to Singleton Harris / Grimes County |
Singleton |
| This models upgrades required for a proposed load addition. Install 300 MVAR capacitor bank at the 345 kV Singleton substation. ERCOT project 110077F |
CNP Tier 4 |
Conceptual Future tab |
345 | Jul 2030 | Singleton Grimes County |
Singleton |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.75D Roans Prairie to Singleton increase thermal limits as part of FRM2 upgrades. ERCOT project 99453F |
CNP Tier 4 |
Planned Future tab |
345 | Oct 2029 | Roans Prairie to Singleton Grimes County |
Roans Prairie, Singleton |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.74C Tomball to Singleton to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453T |
CNP Tier 4 |
Planned Future tab |
345 | Oct 2029 | Tomball to Singleton Harris / Grimes County |
Tomball, Singleton |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.75 Singleton to Gibbons Creek to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453Y |
CNP Tier 4 |
Planned Future tab |
345 | May 2027 | Singleton to Gibbons Creek Grimes County |
Singleton, Gibbons Creek |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.99 Singleton to Gibbons Creek to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453Z |
CNP Tier 4 |
Planned Future tab |
345 | May 2027 | Singleton to Gibbons Creek Grimes County |
Singleton, Gibbons Creek |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110057B | First listed | on the Future tab |
| July 13, 2026 | 110077F | First listed | on the Future tab |
| February 1, 2026 | 99453Y | Projected in-service date | Oct 2029 → May 2027 |
| February 1, 2026 | 99453Z | Projected in-service date | Oct 2029 → May 2027 |
| October 1, 2025 | 99453F | First listed | on the Future tab |
| October 1, 2025 | 99453T | First listed | on the Future tab |
| October 1, 2025 | 99453Y | First listed | on the Future tab |
| October 1, 2025 | 99453Z | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.