Substation Scout

Gibbons Creek

Named in 5 listed projects in ERCOT’s transmission project tracking workbook, in Grimes County. First named in the release with data as of February 1, 2015.

Grimescounty as printed
138, 345kV
BRYN, CNPutility
5projects listed

Also printed as: Gibbon's Creek

A HIFLD substation record has the same name and county: GIBBONS CREEK (GRIMES County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Grimes, TX: ERCOT queue, 16 active of 18 · MISO queue, 1 active of 4. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
This models upgrades required for a proposed load addition
Install new 345 kV substation (NewSub). Loop into the existing Zenith to Mission ckt.18 and Zenith to Gibbons Creek ckt.50.
ERCOT project 110057A
CNP
Tier 4
Conceptual
Future tab
345 Jul 2028 NewSub to Zenith/Gibbons Creek;
Harris / Grimes County
Zenith, Gibbons Creek
This models upgrades required for a proposed load addition.
Loop NewSub into the existing Zenith to Gibbons Creek ckt. 50.
ERCOT project 110077B
CNP
Tier 4
Conceptual
Future tab
345 Jul 2028 NewSub to Zenith/Gibbon's Creek
Harris / Grimes County
Zenith, Gibbon's Creek
No title printed
Reconductor Gibbons Creek to Greens Prairie Line
ERCOT project 80384
BRYN
Tier 4
Planned
Completed tab
138 Mar 2026
actual 2026-03
Gibbons Creek to Greens Pairie
Grimes / Brazos County
Gibbons Creek, Greens Pairie
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.75 Singleton to Gibbons Creek to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453Y
CNP
Tier 4
Planned
Future tab
345 May 2027 Singleton to Gibbons Creek
Grimes County
Singleton, Gibbons Creek
Facility Ratings Methodology Phase 2 (FRM2) Upgrades
Upgrade Ckt.99 Singleton to Gibbons Creek to increase thermal limits as part of FRM2 upgrades.
ERCOT project 99453Z
CNP
Tier 4
Planned
Future tab
345 May 2027 Singleton to Gibbons Creek
Grimes County
Singleton, Gibbons Creek

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110057AFirst listedon the Future tab
July 13, 2026110077BFirst listedon the Future tab
June 1, 202680384Moved between tabsCurrent-year planned → Completed
February 1, 202680384Moved between tabsFuture → Current-year planned
February 1, 202680384Projected in-service dateJun 2026 → Mar 2026
February 1, 202699453YProjected in-service dateOct 2029 → May 2027
February 1, 202699453ZProjected in-service dateOct 2029 → May 2027
October 1, 202599453YFirst listedon the Future tab
October 1, 202599453ZFirst listedon the Future tab
June 1, 202480384First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first