Substation Scout

Grimes, TX interconnection queue

1 active project totaling 51 MW in the MISO queue, plus 3 with terminal status (shown grayed).

1active projects
51active MW
4total filed
Queue IDProjectkVMWResourceStatus
J479 Not reported 345 462 Gas Withdrawn
J1100 Not reported 345 200 Solar Withdrawn
J1709 Not reported 138 100 Battery Withdrawn
J486 Not reported 345 51 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first