Whaley
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Fort Bend County. First named in the release with data as of May 12, 2023.
Fort Bendcounty as printed
138, 345kV
CNPutility
2projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Fort Bend, TX: ERCOT queue, 10 active of 14. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| This models upgrades required for a proposed load addition Install new 345kV substation. Loop WAP-Whaley Ckt 72. ERCOT project 110084A |
CNP Tier 1 |
Conceptual Future tab |
345 | Oct 2027 | CEHE_Newsub to WAParish/Whaley Fort Bend County |
WAParish, Whaley |
| BP24 Sub Upgrades Upgrade Whaley to WA Parish Ckt.72F to increase thermal limits ERCOT project 73371E |
CNP Tier 4 |
Planned Current-year planned tab |
138 | Nov 2026 actual 9999-01 |
Whaley to WA Parish Fort Bend County |
Whaley, WA Parish |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110084A | First listed | on the Future tab |
| February 1, 2026 | 73371E | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 73371E | Projected in-service date | May 2026 → Nov 2026 |
| February 1, 2025 | 73371E | Moved between tabs | Completed → Future |
| February 1, 2025 | 73371E | Projected in-service date | May 2024 → May 2026 |
| October 1, 2024 | 73371E | Moved between tabs | Future → Completed |
| October 1, 2024 | 73371E | Projected in-service date | May 2025 → May 2024 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.