Flewellen

Named in 8 listed projects in ERCOT’s transmission project tracking workbook, in Fort Bend County. First named in the release with data as of February 1, 2015.

Fort Bendcounty as printed
138kV
CNPutility
8projects listed

A HIFLD substation record has the same name and county: FLEWELLEN (FORT BEND County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Fort Bend, TX: ERCOT queue, 10 active of 14. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Hockley Distribution Transformer Addition with Upgrades
Upgrade Ckt.66A Flewellen to Katy tap to increase thermal limits
ERCOT project 104559B
CNP
Tier 4
Planned
Future tab
138 Dec 2027 Flewellen to Katy
Fort Bend / Waller County
Flewellen, Katy
Flewellen 4th Distribution Transformer Addition and associated upgrades
Install fourth Flewellen distribution transformer TR4. Tap transformer at the Flewellen breaker position on Ckt.09H Flewellen to Katy.
ERCOT project 109652A
CNP
Tier 4
Planned
Future tab
138 May 2027 Flewellen
Fort Bend County
Flewellen
Flewellen 4th Distribution Transformer Addition and associated upgrades
Upgrade Flewellen equipment at the Ckt.73D breaker position to Obrien to increase thermal limits Ckt.73D Obrien to Flewellen.
ERCOT project 109652B
CNP
Tier 4
Planned
Future tab
138 May 2027 Flewellen
Fort Bend County
Flewellen
Flewellen 4th Distribution Transformer Addition and associated upgrades
Upgrade Ckt.09G Brazos Valley to Fort Bend to increase thermal limits.
ERCOT project 109652C
CNP
Tier 4
Planned
Future tab
138 May 2027 Flewellen
Fort Bend County
Flewellen
138kV Flewellen to Fort Bend Ckt 09G-60E Upgrades
Upgrade Ckt.09G Flewellen to Brazos Valley to increase thermal limits. Expect 2-959ACSS reconductor as first phase of Ckt.09G upgrade.
ERCOT project 99009A · RPG 25RPG010
CNP
Tier 3
Planned
Future tab
138 May 2028 Flewellen to Brazos Valley
Fort Bend County
Flewellen, Brazos Valley
138kV Flewellen to Fort Bend Ckt 09G-60E Upgrades
Upgrade Ckt.09G Flewellen to Brazos Valley to increase thermal limits. Expect FL/BV equipment upgrade as second phase of Ckt.09G upgrade.
ERCOT project 99009B · RPG 25RPG010
CNP
Tier 3
Planned
Future tab
138 May 2029 Flewellen to Brazos Valley
Fort Bend County
Flewellen, Brazos Valley
138kV Flewellen to Fort Bend Ckt 09G-60E Upgrades
Upgrade Ckt.60E Flewellen to Fort Bend to increase thermal limits. Expect 2-959ACSS reconductor as first phase of Ckt.60E upgrade
ERCOT project 99009C · RPG 25RPG010
CNP
Tier 3
Planned
Future tab
138 May 2028 Flewellen to Fort Bend
Fort Bend County
Flewellen, Fort Bend
138kV Flewellen to Fort Bend Ckt 09G-60E Upgrades
Upgrade Ckt.60E Flewellen to Fort Bend to increase thermal limits. Expect Flewellen equipment upgrades and Fort Bend equipment/Relay upgrades to reach the Minimum ratings as second phase of upgrade
ERCOT project 99009D · RPG 25RPG010
CNP
Tier 3
Planned
Future tab
138 May 2029 Flewellen to Fort Bend
Fort Bend County
Flewellen, Fort Bend

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026109652AFirst listedon the Future tab
July 13, 2026109652BFirst listedon the Future tab
July 13, 2026109652CFirst listedon the Future tab
July 13, 202699009AProjected in-service dateMay 2027 → May 2028
July 13, 202699009CProjected in-service dateMay 2027 → May 2028
June 1, 2026104559BFirst listedon the Future tab
October 1, 202599009AFirst listedon the Future tab
October 1, 202599009BFirst listedon the Future tab
October 1, 202599009CFirst listedon the Future tab
October 1, 202599009DFirst listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.