Fort Bend
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Fort Bend County. First named in the release with data as of February 1, 2015.
Fort Bendcounty as printed
138kV
CNPutility
3projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Fort Bend, TX: ERCOT queue, 10 active of 14. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Upgrade Ckt.60A Fort Bend to Rosenberg to increase thermal limits. ERCOT project 109573 |
CNP Tier 4 |
Planned Future tab |
138 | May 2028 | Fort Bend to Rosenberg Fort Bend County |
Fort Bend, Rosenberg |
| 138kV Flewellen to Fort Bend Ckt 09G-60E Upgrades Upgrade Ckt.60E Flewellen to Fort Bend to increase thermal limits. Expect 2-959ACSS reconductor as first phase of Ckt.60E upgrade ERCOT project 99009C · RPG 25RPG010 |
CNP Tier 3 |
Planned Future tab |
138 | May 2028 | Flewellen to Fort Bend Fort Bend County |
Flewellen, Fort Bend |
| 138kV Flewellen to Fort Bend Ckt 09G-60E Upgrades Upgrade Ckt.60E Flewellen to Fort Bend to increase thermal limits. Expect Flewellen equipment upgrades and Fort Bend equipment/Relay upgrades to reach the Minimum ratings as second phase of upgrade ERCOT project 99009D · RPG 25RPG010 |
CNP Tier 3 |
Planned Future tab |
138 | May 2029 | Flewellen to Fort Bend Fort Bend County |
Flewellen, Fort Bend |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 109573 | First listed | on the Future tab |
| July 13, 2026 | 99009C | Projected in-service date | May 2027 → May 2028 |
| October 1, 2025 | 99009C | First listed | on the Future tab |
| October 1, 2025 | 99009D | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.