Mascho
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Andrews County. First named in the release with data as of June 1, 2026.
Also printed as: Mascho 345 kV Switch
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Andrews, TX: ERCOT queue, 8 active of 10 · SPP queue, 1 active of 3. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Construct Mascho - Border - Drill Hole 345 kV DCKT Line Construct Mascho - Border - Drill Hole 345 kV DCKT Line. Also adds Permian Basin Reliability Plan Upgrade ID L2B. Loop the Stage 5 upgrade of new Clearfork - Drill Hole 345-kV double-circuit line into the new Border 345-kV substation ERCOT project 92734 · utility no. R8792 R8802 R8803 · RPG 24RPG015 |
ONCOR Tier 1 |
Planned Future tab |
345 | Jun 2028 | Mascho to Drill Hole Andrews / Culberson County |
Mascho, Drill Hole |
| Mascho (fka Clearfork) 345 kV Switch Construct Mascho (fka Clearfork) 345 kV Switch approved as part of 24RPG015 ERCOT project 99287 · utility no. R8801 · RPG 24RPG015 |
ONCOR Tier 1 |
Planned Current-year planned tab |
345 | Dec 2026 | Mascho to Mascho Andrews County |
Mascho |
| Mascho - Lamesa 345 kV Double Circuit Line Construct Mascho - Lamesa 345 kV DCKT Line approved as part of 24RPG015 ERCOT project 99318 · utility no. R8792 · RPG 24RPG015 |
ONCOR Tier 1 |
Planned Future tab |
345 | May 2029 | Mascho 345 kV Switch to Lamesa 345 kV Switch Andrews / Dawson County |
Mascho 345 kV Switch, Lamesa 345 kV Switch |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| February 1, 2026 | 99287 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 92734 | Projected in-service date | May 2029 → Jun 2028 |
| October 1, 2025 | 99287 | First listed | on the Future tab |
| October 1, 2025 | 99318 | First listed | on the Future tab |
| June 1, 2025 | 92734 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.