Substation Scout

El Capitan

Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Culberson County. First named in the release with data as of October 1, 2025.

Culbersoncounty as printed
345kV
ONCORutility
3projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Culberson, TX: ERCOT queue, 5 active of 7. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Establish El Capitan 345/138 kV Switch
Add Permian Basin Reliability Plan Upgrade ID L5A Establish a new Culberson 345/138-kV substation at the existing Culberson Switch and install two new 345/138-kV transformers
ERCOT project 99006 · utility no. PB_L5_A
ONCOR
Tier 3
Planned
Future tab
345 Dec 2027 El Capitan to El Capitan
Culberson County
El Capitan
Drill Hole - El Capitan (fka Culberson) 345 kV double-circuit line
Add Permian Basin Reliability Plan Upgrade ID L5D Add a new Drill Hole - El Capitan (fka Culberson) 345-kV double-circuit line
ERCOT project 99016 · utility no. PB_L5_D
ONCOR
Tier 2
Planned
Future tab
345 Dec 2027 Drill Hole to El Capitan
Culberson County
Drill Hole, El Capitan
Dry Lake 345/138 kV Switch (fka ONC900005_TAP 11610) and two new 345/138 kV autotransformers
Add Permian Basin Reliability Plan Upgrade ID L5B and L5E Establish a new ONC900005_TAP 345/138-kV substation and install two new 345/138-kV transformers and Add a new El Capitan - Dry Lake (fka 900005Tap) 345-kV double-circuit line
ERCOT project 99018 · utility no. PB_L5_B_E
ONCOR
Tier 1
Planned
Future tab
345 Dec 2028 El Capitan to Dry Lake
Culberson / Reeves County
El Capitan, Dry Lake

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202599006First listedon the Future tab
October 1, 202599016First listedon the Future tab
October 1, 202599018First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.