El Capitan
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Culberson County. First named in the release with data as of October 1, 2025.
Culbersoncounty as printed
345kV
ONCORutility
3projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Culberson, TX: ERCOT queue, 5 active of 7. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Establish El Capitan 345/138 kV Switch Add Permian Basin Reliability Plan Upgrade ID L5A Establish a new Culberson 345/138-kV substation at the existing Culberson Switch and install two new 345/138-kV transformers ERCOT project 99006 · utility no. PB_L5_A |
ONCOR Tier 3 |
Planned Future tab |
345 | Dec 2027 | El Capitan to El Capitan Culberson County |
El Capitan |
| Drill Hole - El Capitan (fka Culberson) 345 kV double-circuit line Add Permian Basin Reliability Plan Upgrade ID L5D Add a new Drill Hole - El Capitan (fka Culberson) 345-kV double-circuit line ERCOT project 99016 · utility no. PB_L5_D |
ONCOR Tier 2 |
Planned Future tab |
345 | Dec 2027 | Drill Hole to El Capitan Culberson County |
Drill Hole, El Capitan |
| Dry Lake 345/138 kV Switch (fka ONC900005_TAP 11610) and two new 345/138 kV autotransformers Add Permian Basin Reliability Plan Upgrade ID L5B and L5E Establish a new ONC900005_TAP 345/138-kV substation and install two new 345/138-kV transformers and Add a new El Capitan - Dry Lake (fka 900005Tap) 345-kV double-circuit line ERCOT project 99018 · utility no. PB_L5_B_E |
ONCOR Tier 1 |
Planned Future tab |
345 | Dec 2028 | El Capitan to Dry Lake Culberson / Reeves County |
El Capitan, Dry Lake |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2025 | 99006 | First listed | on the Future tab |
| October 1, 2025 | 99016 | First listed | on the Future tab |
| October 1, 2025 | 99018 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner