Sjolander
Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Chambers County. First named in the release with data as of June 1, 2025.
Described as new. The quoted wording calls this substation new. “new CEHE-owned Sjolander substation” — project 90255F description, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Chambers, TX: ERCOT queue, 2 active of 3 · MISO queue, 1 active of 3. Same county, not the same substation.
Location
Chambers County, TX
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
Note: Road-name grade not applied: Sjolander Drive (OSM ways 15450883, 559663701, 1359283335; 29.776-29.828 N, about 94.935-94.943 W) lies in Harris County on the west side of Cedar Bayou, while TPIT prints Chambers County for every Sjolander row, so the road does not fit the printed county. TPIT is itself inconsistent about the CHEVRON customer station it reconnects (Harris in 90255C, Chambers in 90255I).
Sources: ERCOT TPIT, projects 90255F, 90255G, 90255H, 90255I (Jordan / Mont Belvieu Area Improvement Project, 24RPG026) (release 39, 2026-10-01) · ERCOT System Planning Monthly Status Update (December 2024): 24RPG026 Jordan/Mont Belvieu Area Improvement Project, CNP, Tier 3 (2025-01-24) · OpenStreetMap: Sjolander Drive (ways 15450883, 559663701, 1359283335), Baytown, Harris County (OSM via Nominatim, 2026-11-21). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Jordan / Mont Belvieu Area Improvement Project Install new CEHE-owned Sjolander substation. Reconfigure existing Ckt.84D Cedar Bayou to CD/HOPSON and loop into Sjolander substation to create new Ckt.84 Cedar Bayou to Cedar Bayou tap to Sjolander to HOPSON. ERCOT project 90255F · RPG 24RPG026 |
CNP Tier 3 |
Planned Future tab |
138 | May 2028 | Sjolander to Cedar Bayou /HOPSON Chambers County |
Sjolander, Cedar Bayou, HOPSON |
| Jordan / Mont Belvieu Area Improvement Project Install new CEHE-owned Sjolander substation. Reconfigure existing Ckt.86A Cedar Bayou to CHEVRON and loop into Sjolander substation to create new Ckt.86 Cedar Bayou to Sjolander to Kilgore to Langston. ERCOT project 90255G · RPG 24RPG026 |
CNP Tier 3 |
Planned Future tab |
138 | May 2028 | Cedar Bayou to Sjolander Chambers County |
Cedar Bayou, Sjolander |
| Jordan / Mont Belvieu Area Improvement Project Install new CEHE-owned Sjolander substation. Reconfigure existing Ckt.86 CHEVRON to Kilgore to LANGSTON and loop into Sjolander substation to create new Ckt.86 Sjolander to Kilgore to LANGSTON. ERCOT project 90255H · RPG 24RPG026 |
CNP Tier 3 |
Planned Future tab |
138 | May 2028 | Kilgore to Sjolander/LANGSTON Chambers County |
Kilgore, Sjolander, LANGSTON |
| Jordan / Mont Belvieu Area Improvement Project Install new CEHE-owned Sjolander substation. Disconnect existing circuits 86A and 86B from CHEVRON customer substation. Reconnect CHEVRON substation to Sjolander substation as Ckt.13 Sjolander to CHEVRON and Ckt.23 Sjolander to CHEVRON. ERCOT project 90255I · RPG 24RPG026 |
CNP Tier 3 |
Planned Future tab |
138 | May 2028 | Sjolander to CHEVRON Chambers County |
Sjolander, CHEVRON |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| June 1, 2026 | 90255F | Projected in-service date | May 2027 → May 2028 |
| June 1, 2026 | 90255G | Projected in-service date | May 2027 → May 2028 |
| June 1, 2026 | 90255H | Projected in-service date | May 2027 → May 2028 |
| June 1, 2026 | 90255I | Projected in-service date | May 2027 → May 2028 |
| June 1, 2025 | 90255F | First listed | on the Future tab |
| June 1, 2025 | 90255G | First listed | on the Future tab |
| June 1, 2025 | 90255H | First listed | on the Future tab |
| June 1, 2025 | 90255I | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.