Kilgore
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Chambers County. First named in the release with data as of June 1, 2024.
Chamberscounty as printed
138kV
CNPutility
2projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Chambers, TX: ERCOT queue, 2 active of 3 · MISO queue, 1 active of 3. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Install Kilgore 35kV Distribution Substation. Loop on Ckt.86B to create new Ckt.86 CHEVRON to Kilgore to LANGSTON ERCOT project 80632 |
CNP Tier 4 |
Planned Current-year planned tab |
138 | Dec 2026 | Kilgore to CHEVRON/LANGSTON Chambers County |
Kilgore, CHEVRON, LANGSTON |
| Jordan / Mont Belvieu Area Improvement Project Install new CEHE-owned Sjolander substation. Reconfigure existing Ckt.86 CHEVRON to Kilgore to LANGSTON and loop into Sjolander substation to create new Ckt.86 Sjolander to Kilgore to LANGSTON. ERCOT project 90255H · RPG 24RPG026 |
CNP Tier 3 |
Planned Future tab |
138 | May 2028 | Kilgore to Sjolander/LANGSTON Chambers County |
Kilgore, Sjolander, LANGSTON |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| June 1, 2026 | 80632 | Projected in-service date | Aug 2026 → Dec 2026 |
| June 1, 2026 | 90255H | Projected in-service date | May 2027 → May 2028 |
| February 1, 2026 | 80632 | Moved between tabs | Future → Current-year planned |
| October 1, 2025 | 80632 | Projected in-service date | May 2026 → Aug 2026 |
| June 1, 2025 | 90255H | First listed | on the Future tab |
| June 1, 2024 | 80632 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner