Substation Scout

Chambers, TX interconnection queue

1 active project totaling 100 MW in the MISO queue, plus 2 with terminal status (shown grayed).

1active projects
100active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2910 Not reported 230 303 Wind Withdrawn
J1812 Not reported 230 294.3 Wind Withdrawn
J2952 Not reported 138 100 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first