Chambers, TX interconnection queue
1 active project totaling 100 MW in the MISO queue, plus 2 with terminal status (shown grayed).
1active projects
100active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J2910 | Not reported | 230 | 303 | Wind | Withdrawn |
| J1812 | Not reported | 230 | 294.3 | Wind | Withdrawn |
| J2952 | Not reported | 138 | 100 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.
Site Scanner