Winchester

Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Bastrop County. First named in the release with data as of June 1, 2025.

Bastropcounty as printed
138kV
LCRATSCutility
2projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Bastrop, TX: ERCOT queue, 14 active of 16. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Smithville to Winchester Transmission Line Upgrade
Upgrade L_WINCHE8_1Y (Bus #7306) - L_SMITHV8_1Y (Bus #7314) 138.0-kV line as an LCP for Batch Zero Base Load.
ERCOT project 109918
LCRATSC
Tier 4
Conceptual
Future tab
138 Dec 2030 Winchester to Smithville
Bastrop / Fayette County
Winchester, Smithville
Sim_Gideon_Winchester_Transmission_Line_Upgrade
LCRA TSC will upgrade Sim Gideon - Winchester 138-kV transmission line to achieve a higher operational rating
ERCOT project 92565 · utility no. PLC-7654 · RTP 2023-SC15
LCRATSC
Tier 4
Planned
Future tab
138 May 2028 No terminals printed
Bastrop County
Sim Gideon, Winchester

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026109918First listedon the Future tab
February 1, 202692565Projected in-service dateMay 2026 → May 2028
June 1, 202592565First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.