Substation Scout

Alum Creek

Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Bastrop County. First named in the release with data as of July 13, 2026.

Bastropcounty as printed
138kV
LCRATSCutility
2projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Bastrop, TX: ERCOT queue, 14 active of 16. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Alum Creek to Sim Gideon Transmission Line Upgrade
Upgrade L_SIMGID8_1Y (Bus #7310) - L_ALUMCR8_1Y (Bus #7318) 138.0-kV line as an LCP for Batch Zero Base Load.
ERCOT project 110073
LCRATSC
Tier 4
Conceptual
Future tab
138 Dec 2030 Sim Gideon to Alum Creek
Bastrop County
Sim Gideon, Alum Creek
Alum Creek - Smithville Transmission Line Upgrade
LCRA will upgrade the Transmission Line between Alum Creek (7314) and Smithville (7318) to a minimum rating of 340 MVA. Upgrade project for Batch Zero Base Load
ERCOT project 110142
LCRATSC
Tier 4
Conceptual
Future tab
138 Dec 2030 Smithville to Alum Creek
Bastrop County
Smithville, Alum Creek

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110073First listedon the Future tab
July 13, 2026110142First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.

Before relying on any of this