Andrews, TX interconnection queue

9 active projects totalling 2,211.3 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

9active projects
2,211.3active MW
10total filed
Queue IDProjectkVMWResourceStatus
30INR0135 Blue Sage Wind 345 394.1 Wind SS Started, FIS Started, No IA
27INR0386 Straight Spur Storage 345 306.2 Battery SS Completed, FIS Started, No IA
27INR0385 Straight Spur Solar 345 251.8 Solar SS Completed, FIS Started, No IA
27INR0384 Straight Spur Wind 345 247.4 Wind SS Completed, FIS Started, No IA
23INR0279 Trivor BESS 138 205.5 Battery SS Completed, FIS Started, No IA
23INR0104 BRP Kamet BESS 138 202.5 Battery SS Completed, FIS Started, No IA
22INR0427 BRP Kabru BESS 138 202.5 Battery SS Completed, FIS Started, No IA
23INR0278 Tucana BESS 138 201.3 Battery SS Completed, FIS Completed, No IA
19INR0103 Rodeo Solar 138 200 Solar SS Completed, FIS Started, IA
20INR0096 Desert Rose Solar n/r 200 Solar Inactive

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.