Lamesa
Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Dawson County. First named in the release with data as of February 1, 2015.
Dawsoncounty as printed
69, 345kV
ONCORutility
4projects listed
Also printed as: Lamesa 345 kV Switch
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Dawson, TX: ERCOT queue, 8 active of 8. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Mascho - Lamesa 345 kV Double Circuit Line Construct Mascho - Lamesa 345 kV DCKT Line approved as part of 24RPG015 ERCOT project 99318 · utility no. R8792 · RPG 24RPG015 |
ONCOR Tier 1 |
Planned Future tab |
345 | May 2029 | Mascho 345 kV Switch to Lamesa 345 kV Switch Andrews / Dawson County |
Mascho 345 kV Switch, Lamesa 345 kV Switch |
| Establish Pivot 138/69 kV Switch Construct Pivot 138/69 kV Switch approved as part of 24RPG015 ERCOT project 99413 · utility no. R8800 · RPG 24RPG015 |
ONCOR Tier 1 |
Planned Current-year planned tab |
69 | Dec 2026 | Lamesa to Pivot Dawson County |
Lamesa, Pivot |
| Establish Lamesa 345/138 kV Switch Construct Lamesa 345/138 kV Switch approved as part of 24RPG015 ERCOT project 99417 · utility no. R8800 · RPG 24RPG015 |
ONCOR Tier 1 |
Planned Future tab |
345 | May 2029 | Lamesa to Lamesa Dawson County |
Lamesa |
| Lamesa - Faraday 345 kV Double Circuit Line Oncor and WETT joint project to construct the Lamesa (Oncor) - Faraday (WETT) 345 kV DCKT Line approved as part of 24RPG015 ERCOT project 99419 · utility no. R8792 · RPG 24RPG015 |
ONCOR Tier 1 |
Planned Future tab |
345 | May 2029 | Lamesa to Faraday Dawson / Borden County |
Lamesa, Faraday |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| February 1, 2026 | 99413 | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 99413 | Projected in-service date | Nov 2026 → Dec 2026 |
| October 1, 2025 | 99318 | First listed | on the Future tab |
| October 1, 2025 | 99413 | First listed | on the Future tab |
| October 1, 2025 | 99417 | First listed | on the Future tab |
| October 1, 2025 | 99419 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.