Andrews, TX interconnection queue
1 active project totaling 350 MW in the SPP queue, plus 2 with terminal status (shown grayed).
1active projects
350active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2024-280 | Not reported | 345 | 350 | Hybrid | Active |
| GEN-2016-062 | Not reported | 230 | 250.7 | Wind | Withdrawn |
| GEN-2016-015 | Not reported | 230 | 100 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.