Substation Scout

Andrews, TX interconnection queue

1 active project totaling 350 MW in the SPP queue, plus 2 with terminal status (shown grayed).

1active projects
350active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-280 Not reported 345 350 Hybrid Active
GEN-2016-062 Not reported 230 250.7 Wind Withdrawn
GEN-2016-015 Not reported 230 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first