Substation Scout

Rockbridge

Named in 3 PJM planning documents for 1 project, from March 18, 2026 to October 6, 2026.

Not stateddescribed as
DOMzone
115kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
115 kV Line #26 (Buena Vista-Rockbridge) EOL Rebuild
DOM-2025-0091 · s3911
Engineering $15M 12/31/2027 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BALCONY FALLS; BUENA VISTA; LEXINGTON; ROCKBRIDGE → BUENA VISTA; ROCKBRIDGE 2026-05-14 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 98
115 kV Line #26 (Buena Vista-Rockbridge) EOL Rebuild No role wording
2026-05-14 SRRTEP Southern
Item 04 - DOM Supplemental Projects p. 7
115 kV Line #26 (Buena Vista-Rockbridge) EOL Rebuild No role wording
115kV
2026-03-18 SRRTEP Mid-Atlantic
Item 05 - DOM Supplemental Projects p. 5
115 kV Line #26 (Buena Vista-Rockbridge) EOL Rebuild No role wording
115kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this