Buena Vista substation

Named in 3 PJM planning documents for 1 project, from March 18, 2026 to October 6, 2026.

Existingdescribed as
DOMzone
115kVkV as printed
3mentions

Also printed as: Buena Vista

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
115 kV Line #26 (Buena Vista-Rockbridge) EOL Rebuild
DOM-2025-0091 · s3911
Engineering $15M 12/31/2027 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BALCONY FALLS; BUENA VISTA; LEXINGTON; ROCKBRIDGE → BUENA VISTA; ROCKBRIDGE 2026-05-14 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 99
115 kV Line #26 (Buena Vista-Rockbridge) EOL Rebuild No role wording
2026-05-14 SRRTEP Southern
Item 04 - DOM Supplemental Projects p. 8
115 kV Line #26 (Buena Vista-Rockbridge) EOL Rebuild “Rebuild approximately 6.36 miles single circuit of line#26 between Rockbridge to Buena Vista substation”
115kV
2026-03-18 SRRTEP Mid-Atlantic
Item 05 - DOM Supplemental Projects p. 5
115 kV Line #26 (Buena Vista-Rockbridge) EOL Rebuild No role wording
115kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.