Substation Scout

Russia

Named in 1 PJM planning document for 1 project, on October 6, 2026.

Existingdescribed as
DAYTONzone
—kV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AMPT Projects in DAY Transmission Zone M3 Process
AMPT-2024-001 · s3734.1 (AMPT), s3734.2 (AMPT), s3734.3 (AMPT), s3734.4 (AMPT), s3734.5 (AMPT), s3734.6 (AMPT), s3734.7 (AES), s3734.8 (AES)
Engineering $66.6 M 6/30/2028 16 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Status engineering (pre-engineering) → engineering (Engineering) 2025-02-14 2026-10-06
Substations named BAKER ROAD; GREENLAWN; MCGREEVEY ROAD; RUSSIA; WATER STREET → BAKER ROAD; GREENLAWN; MCGREEVEY ROAD; ROSSBURG; RUSSIA; WATER STREET 2026-10-06 Not reported
Substations named BAKER ROAD; GREENLAWN; MCGREEVEY ROAD; ROSSBURG; RUSSIA; WATER STREET; WATER STREET TAP → BAKER ROAD; GREENLAWN; MCGREEVEY ROAD; RUSSIA; WATER STREET 2026-10-06 2026-10-06
Substations named BAKER RD; BAKER ROAD; GREENLAWN; RUSSIA; SUBLER DRIVE; WATER STREET → BAKER ROAD; GREENLAWN; MCGREEVEY ROAD; ROSSBURG; RUSSIA; WATER STREET; WATER STREET TAP 2025-02-14 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dayton Local Plan Submission of the supplemental projects for 2026 p. 15
AMPT Projects in DAY Transmission Zone M3 Process “Expand the existing ring bus at Russia substation”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this