Substation Scout

Subler Drive

Named in 1 PJM planning document for 1 project, on February 14, 2025.

Newdescribed as
AMPTzone
69 kVkV as printed
1mentions

Described as new: “Build a new greenfield 69 kV station” — source, page 4

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Versailles, OH
AMPT-2024-001
Engineering $66.6 M 06/30/2028 16 MW 2025-02-14
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Status engineering (pre-engineering) → engineering (Engineering) 2025-02-14 2026-10-06
Substations named BAKER ROAD; GREENLAWN; MCGREEVEY ROAD; RUSSIA; WATER STREET → BAKER ROAD; GREENLAWN; MCGREEVEY ROAD; ROSSBURG; RUSSIA; WATER STREET 2026-10-06 Not reported
Substations named BAKER ROAD; GREENLAWN; MCGREEVEY ROAD; ROSSBURG; RUSSIA; WATER STREET; WATER STREET TAP → BAKER ROAD; GREENLAWN; MCGREEVEY ROAD; RUSSIA; WATER STREET 2026-10-06 2026-10-06
Substations named BAKER RD; BAKER ROAD; GREENLAWN; RUSSIA; SUBLER DRIVE; WATER STREET → BAKER ROAD; GREENLAWN; MCGREEVEY ROAD; ROSSBURG; RUSSIA; WATER STREET; WATER STREET TAP 2025-02-14 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2025-02-14 SRRTEP Western
Item 01 - AMPT Supplemental Projects p. 4
Versailles, OH “Build a new greenfield 69 kV station”
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this