Substation Scout

Weldon Substation

Named in 1 PJM planning document for 1 project, on February 14, 2025.

Newdescribed as
ATSIzone
—kV as printed
1mentions

Described as new: “previously proposed Weldon Substation and line build” — source, page 5

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Ellsworth Substation – s1952 Scope Change
s1952
Engineering $36.3M 4/30/2027 19 MW 2025-02-14
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$27 M → $36.3M 2025-02-14 2025-02-14

Every mention

DateDocumentProjectWhat the document says about it
2025-02-14 SRRTEP Western
Item 07 - ATSI Supplemental Project p. 5
Ellsworth Substation – s1952 Scope Change “previously proposed Weldon Substation and line build”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.