Johnston, OK interconnection queue

11 active projects totaling 3,441.6 MW in the SPP queue, plus 8 with terminal status (shown grayed).

11active projects
3,441.6active MW
19total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-132 Not reported 345 1,300 Gas Active
GEN-2016-019 Not reported 345 1,219 Gas Withdrawn
GEN-2016-018 Not reported 345 884 Gas Withdrawn
GEN-2024-338 Not reported 345 350 Solar Active
GEN-2015-036 Not reported 345 303.6 Wind Operational
GEN-2017-149 Not reported 345 258 Wind Active
GEN-2017-154 Not reported 345 255 Wind Withdrawn
GEN-2021-016 Not reported 345 250 Wind Active
GEN-2016-063 Not reported 345 200 Wind Withdrawn
GEN-2017-075 Not reported 345 200 Solar Active
GEN-2020-SR3 Not reported 345 200 Battery Withdrawn
GEN-2022-098 Not reported 345 200 Solar Active
GEN-2024-SR6 Not reported 345 200 Battery Active
GEN-2022-145 Not reported 138 180 Battery Active
GEN-2023-016 Not reported 138 130 Solar Withdrawn
GEN-2020-015 Not reported 345 104 Solar Withdrawn
GEN-2016-030 Not reported 138 100 Solar Active
GEN-2020-SR2 Not reported 138 100 Battery Active
GEN-2016-033 Not reported 138 82.3 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.