SPP request GEN-2024-SR6
SPP queue ID GEN-2024-SR6
Queue request GEN-2024-SR6 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW battery project in Johnston County, OK, according to Berkeley Lab’s queue data file. The filing names Interconnecting at Hugo - Sunnyside transmission line as its point of interconnection. Its status as of December 31, 2025 was “Active”.
| Queue ID | GEN-2024-SR6 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Interconnecting at Hugo - Sunnyside transmission line |
| Point of interconnection | Interconnecting at Hugo - Sunnyside 345 kV transmission line |
| County | Johnston |
| State | OK |
| Voltage | 345 kV |
| Capacity | 200 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | Not reported |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Johnston, OK: 19 requests in the SPP queue, 11 active totaling 3,441.6 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | OG&E |
|---|---|
| Cluster | Surplus; 04 SOUTHEAST |
| Interconnection service | ERIS |
| Project type | Surplus |
| Study phase (standardized by Berkeley Lab) | IA Pending |
| Study phase (as the queue printed it) | IA PENDING |
| Queue date | 2024-02-20 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.