SPP request GEN-2024-SR6

SPP queue ID GEN-2024-SR6

Queue request GEN-2024-SR6 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW battery project in Johnston County, OK, according to Berkeley Lab’s queue data file. The filing names Interconnecting at Hugo - Sunnyside transmission line as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue IDGEN-2024-SR6
Project nameNot reported
Status (as published)Active
SubstationInterconnecting at Hugo - Sunnyside transmission line
Point of interconnectionInterconnecting at Hugo - Sunnyside 345 kV transmission line
CountyJohnston
StateOK
Voltage345 kV
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Johnston, OK: 19 requests in the SPP queue, 11 active totaling 3,441.6 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOG&E
ClusterSurplus; 04 SOUTHEAST
Interconnection serviceERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)IA PENDING
Queue date2024-02-20

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.