SPP request GEN-2024-132

SPP queue ID GEN-2024-132

Queue request GEN-2024-132 was listed in the SPP interconnection queue at the end of 2025 as a 1,300 MW gas project in Johnston County, OK, according to Berkeley Lab’s queue data file. The filing names Hugo (71 miles) - Sunnyside (42 miles) Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2031.

Queue IDGEN-2024-132
Project nameNot reported
Status (as published)Active
SubstationHugo (71 miles) - Sunnyside (42 miles) Line
Point of interconnectionHugo (71 miles) - Sunnyside (42 miles) 345 kV Line
CountyJohnston
StateOK
Voltage345 kV
Capacity1,300 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2031-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Johnston, OK: 19 requests in the SPP queue, 11 active totaling 3,441.6 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOGE
ClusterDISIS-2024-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.