SPP request GEN-2021-016

SPP queue ID GEN-2021-016

Queue request GEN-2021-016 was listed in the SPP interconnection queue at the end of 2025 as a 250 MW wind project in Johnston County, OK, according to Berkeley Lab’s queue data file. The filing names Sunnyside-Johnston as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2029.

Queue IDGEN-2021-016
Project nameNot reported
Status (as published)Active
SubstationSunnyside-Johnston
Point of interconnectionSunnyside-Johnston 345 kV
CountyJohnston
StateOK
Voltage345 kV
Capacity250 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2029-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Johnston, OK: 19 requests in the SPP queue, 11 active totaling 3,441.6 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterDISIS-2021-001; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2021-04-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.