Substation Scout

SPP request GEN-2020-SR2

SPP queue ID GEN-2020-SR2

Queue request GEN-2020-SR2 was listed in the SPP interconnection queue at the end of 2025 as a 100 MW battery project in Johnston County, OK, according to Berkeley Lab’s queue data file. The filing names Brown as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 31, 2026.

Queue IDGEN-2020-SR2
Project nameNot reported
Status (as published)Active
SubstationBrown
Point of interconnectionBrown 138kV
CountyJohnston
StateOK
Voltage138 kV
Capacity100 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-03-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Brown substation: 2 requests in the SPP queue, 2 active totaling 200 MW.

Queue IDProjectMWResourceStatus
GEN-2016-030Not reported100SolarActive

Johnston, OK: 19 requests in the SPP queue, 11 active totaling 3,441.6 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOGE
ClusterSurplus; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2020-08-04

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.