Ellis, KS interconnection queue

6 active projects totaling 612.1 MW in the SPP queue, plus 6 with terminal status (shown grayed).

6active projects
612.1active MW
12total filed
Queue IDProjectkVMWResourceStatus
GEN-2008-092 Not reported 230 200.5 Wind Operational
GEN-2006-032 Not reported 230 200 Wind Withdrawn
GEN-2008-001 Not reported n/r 200 Wind Withdrawn
GEN-2022-075 Not reported 345 175 Solar Active
GEN-2023-SR14 Not reported 230 165 Other Withdrawn
GEN-2008-089 Not reported n/r 150 Wind Withdrawn
GEN-2021-076 Not reported 345 113 Solar Active
GEN-2006-031 Not reported 115 75.6 Gas Operational
GEN-2005-020 Not reported n/r 50 Wind Withdrawn
GEN-2013-033 Not reported 115 28 Gas Operational
GEN-2015-072 Not reported 230 20.9 Solar Withdrawn
GEN-2016-160 Not reported 230 20 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.