Ellis, KS interconnection queue
6 active projects totaling 612.1 MW in the SPP queue, plus 6 with terminal status (shown grayed).
6active projects
612.1active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2008-092 | Not reported | 230 | 200.5 | Wind | Operational |
| GEN-2006-032 | Not reported | 230 | 200 | Wind | Withdrawn |
| GEN-2008-001 | Not reported | n/r | 200 | Wind | Withdrawn |
| GEN-2022-075 | Not reported | 345 | 175 | Solar | Active |
| GEN-2023-SR14 | Not reported | 230 | 165 | Other | Withdrawn |
| GEN-2008-089 | Not reported | n/r | 150 | Wind | Withdrawn |
| GEN-2021-076 | Not reported | 345 | 113 | Solar | Active |
| GEN-2006-031 | Not reported | 115 | 75.6 | Gas | Operational |
| GEN-2005-020 | Not reported | n/r | 50 | Wind | Withdrawn |
| GEN-2013-033 | Not reported | 115 | 28 | Gas | Operational |
| GEN-2015-072 | Not reported | 230 | 20.9 | Solar | Withdrawn |
| GEN-2016-160 | Not reported | 230 | 20 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.