Substation Scout

SPP request GEN-2022-075

SPP queue ID GEN-2022-075

Queue request GEN-2022-075 was listed in the SPP interconnection queue at the end of 2025 as a 175 MW solar project in Ellis County, KS, according to Berkeley Lab’s queue data file. The filing names Tap on the Spearville - Post Rock line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 19, 2027.

Queue IDGEN-2022-075
Project nameNot reported
Status (as published)Active
SubstationTap on the Spearville - Post Rock line
Point of interconnectionTap on the Spearville - Post Rock 345kV line
CountyEllis
StateKS
Voltage345 kV
Capacity175 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-11-19
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Ellis, KS: 12 requests in the SPP queue, 6 active totaling 612.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITCGP
ClusterDISIS-2022-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2022-09-02

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.