SPP request GEN-2016-160

SPP queue ID GEN-2016-160

Queue request GEN-2016-160 was listed in the SPP interconnection queue at the end of 2025 as a 20 MW battery project in Ellis County, KS, according to Berkeley Lab’s queue data file. The filing names Post Rock as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2026.

Queue IDGEN-2016-160
Project nameNot reported
Status (as published)Active
SubstationPost Rock
Point of interconnectionPost Rock 230kV
CountyEllis
StateKS
Voltage230 kV
Capacity20 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Post Rock substation: 2 requests in the SPP queue, 2 active totaling 220.5 MW.

Queue IDProjectMWResourceStatus
GEN-2008-092Not reported200.5WindOperational

Ellis, KS: 12 requests in the SPP queue, 6 active totaling 612.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMIDW
ClusterDISIS-2016-002-1; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2016-11-21

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.