Substation Scout

SPP request GEN-2006-031

SPP queue ID GEN-2006-031

Queue request GEN-2006-031 was listed in the SPP interconnection queue at the end of 2025 as a 75.6 MW gas project in Ellis County, KS, according to Berkeley Lab’s queue data file. The filing names Knoll as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of June 1, 2008.

Queue IDGEN-2006-031
Project nameNot reported
Status (as published)Operational
SubstationKnoll
Point of interconnectionKnoll 115kV
CountyEllis
StateKS
Voltage115 kV
Capacity75.6 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2008-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Ellis, KS: 12 requests in the SPP queue, 6 active totaling 612.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMIDW
Cluster03 CENTRAL
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2006-08-16
Operational date2008-06-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first