Substation Scout

SPP request GEN-2013-033

SPP queue ID GEN-2013-033

Queue request GEN-2013-033 was listed in the SPP interconnection queue at the end of 2025 as a 28 MW gas project in Ellis County, KS, according to Berkeley Lab’s queue data file. The filing names Goodman Energy Center as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of February 27, 2016.

Queue IDGEN-2013-033
Project nameNot reported
Status (as published)Operational
SubstationGoodman Energy Center
Point of interconnectionGoodman Energy Center 115kV
CountyEllis
StateKS
Voltage115 kV
Capacity28 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2016-02-27
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Ellis, KS: 12 requests in the SPP queue, 6 active totaling 612.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMIDW
ClusterDISIS-2013-002-2; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2013-09-30
Operational date2016-02-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.