Choctaw, OK interconnection queue

6 active projects totaling 978.8 MW in the SPP queue, plus 7 with terminal status (shown grayed).

6active projects
978.8active MW
13total filed
Queue IDProjectkVMWResourceStatus
GEN-2004-018 Not reported n/r 900 Coal Withdrawn
GEN-2006-038 Not reported n/r 750 Coal Withdrawn
GEN-2024-323 Not reported 345 356.8 Gas Active
GEN-2024-083 Not reported 345 250 Solar Active
GEN-2021-031 Not reported 138 201.6 Battery Withdrawn
GEN-2021-032 Not reported 138 149.8 Solar Withdrawn
GEN-2023-092 Not reported 138 125 Hybrid Active
GEN-2024-373 Not reported 138 120 Hybrid Active
GEN-2017-023 Not reported 138 85 Solar Active
GEN-2008-010 Not reported n/r 50 Coal Withdrawn
GEN-2017-024 Not reported 138 50 Solar Withdrawn
GEN-2023-SR15 Not reported 138 50 Battery Withdrawn
GEN-2024-052 Not reported 138 42 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.