Choctaw, OK interconnection queue
6 active projects totaling 978.8 MW in the SPP queue, plus 7 with terminal status (shown grayed).
6active projects
978.8active MW
13total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2004-018 | Not reported | n/r | 900 | Coal | Withdrawn |
| GEN-2006-038 | Not reported | n/r | 750 | Coal | Withdrawn |
| GEN-2024-323 | Not reported | 345 | 356.8 | Gas | Active |
| GEN-2024-083 | Not reported | 345 | 250 | Solar | Active |
| GEN-2021-031 | Not reported | 138 | 201.6 | Battery | Withdrawn |
| GEN-2021-032 | Not reported | 138 | 149.8 | Solar | Withdrawn |
| GEN-2023-092 | Not reported | 138 | 125 | Hybrid | Active |
| GEN-2024-373 | Not reported | 138 | 120 | Hybrid | Active |
| GEN-2017-023 | Not reported | 138 | 85 | Solar | Active |
| GEN-2008-010 | Not reported | n/r | 50 | Coal | Withdrawn |
| GEN-2017-024 | Not reported | 138 | 50 | Solar | Withdrawn |
| GEN-2023-SR15 | Not reported | 138 | 50 | Battery | Withdrawn |
| GEN-2024-052 | Not reported | 138 | 42 | Hybrid | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.