SPP request GEN-2024-083

SPP queue ID GEN-2024-083

Queue request GEN-2024-083 was listed in the SPP interconnection queue at the end of 2025 as a 250 MW solar project in Choctaw County, OK, according to Berkeley Lab’s queue data file. The filing names Hugo Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2029.

Queue IDGEN-2024-083
Project nameNot reported
Status (as published)Active
SubstationHugo Substation
Point of interconnectionHugo 345 kV Substation
CountyChoctaw
StateOK
Voltage345 kV
Capacity250 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2029-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Hugo Substation substation: 2 requests in the SPP queue, 1 active totaling 250 MW.

Queue IDProjectMWResourceStatus
GEN-2023-009Not reported250BatteryWithdrawn

Choctaw, OK: 13 requests in the SPP queue, 6 active totaling 978.8 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITCGP
ClusterDISIS-2024-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2024-10-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.