Substation Scout

SPP request GEN-2024-323

SPP queue ID GEN-2024-323

Queue request GEN-2024-323 was listed in the SPP interconnection queue at the end of 2025 as a 356.8 MW gas project in Choctaw County, OK, according to Berkeley Lab’s queue data file. The filing names ITC Hugo 7 Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2029.

Queue IDGEN-2024-323
Project nameNot reported
Status (as published)Active
SubstationITC Hugo 7 Substation
Point of interconnectionITC Hugo 7 345 kV Substation
CountyChoctaw
StateOK
Voltage345 kV
Capacity356.8 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2029-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Choctaw, OK: 13 requests in the SPP queue, 6 active totaling 978.8 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITCGP
ClusterDISIS-2024-001; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first