Yorktown substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Yorktown as the point of interconnection, all in York County, VA.
Target commercial operation dates as filed run from May 2014 to Dec 2023 (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-283 | Yorktown 230 kV | 230 | 150 | Battery | Withdrawn | Dec 2023 |
| T06 | Yorktown 3 | 230 | 20 | Other | Withdrawn | May 2014 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Yorktown” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Yorktown: Expansion Tracker, PJM planning: DOM state not printed