Penniman substation interconnection queue

1 active project totalling 8.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
8.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
AJ1-038 Penniman 34.5 kV 34.5 33 Battery Withdrawn
AH1-138 Penniman 34.5 kV 34.5 8.4 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.