York, VA interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 6 with terminal status (shown greyed).
0active projects
0active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-283 | Yorktown 230 kV | 230 | 150 | Battery | Withdrawn |
| AH1-157 | Penniman - Waller 230 kV | 230 | 100 | Battery | Withdrawn |
| C01-1680 | Grafton 115 kV | 115 | 74.5 | Battery | Withdrawn |
| AJ1-038 | Penniman 34.5 kV | 34.5 | 33 | Battery | Withdrawn |
| C01-1681 | Grafton 115 kV | 115 | 25.5 | Battery | Withdrawn |
| T06 | Yorktown 3 | 230 | 20 | Other | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.