Substation Scout

Victoria DP-Martin DP substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-030 Victoria DP-Martin DP 115 kV 115 90 Solar Withdrawn
AI2-244 Victoria DP-Martin DP 115 kV 115 50.3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.