Lone Pine substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-166 | NW-Rocky Ford Solar | 115 | 6 | Solar | Withdrawn |
| AG1-167 | NW-Rocky Ford Solar | 115 | 4.5 | Solar | Withdrawn |
| AG1-168 | NW-Rocky Ford Solar | 115 | 4.5 | Solar | Withdrawn |
| AG1-169 | Lone Pine 115 kV | 115 | 4.5 | Solar | Withdrawn |
| AG1-170 | Lone Pine 115 kV | 115 | 3 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.