Lone Pine substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 5 with terminal status (shown grayed).

5 PJM queue filings name Lone Pine as the point of interconnection, all in Nottoway County, VA.

Target commercial operation date as filed: Oct 2021 (5 filings).

Transmission owner as filed: Dominion (5 filings).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-166 NW-Rocky Ford Solar 115 6 Solar Withdrawn Oct 2021
AG1-167 NW-Rocky Ford Solar 115 4.5 Solar Withdrawn Oct 2021
AG1-168 NW-Rocky Ford Solar 115 4.5 Solar Withdrawn Oct 2021
AG1-169 Lone Pine 115 kV 115 4.5 Solar Withdrawn Oct 2021
AG1-170 Lone Pine 115 kV 115 3 Solar Withdrawn Oct 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Nottoway County, VA

All 12 PJM queue filings in Nottoway County, VA.