Substation Scout

Lone Pine substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
AG1-166 NW-Rocky Ford Solar 115 6 Solar Withdrawn
AG1-167 NW-Rocky Ford Solar 115 4.5 Solar Withdrawn
AG1-168 NW-Rocky Ford Solar 115 4.5 Solar Withdrawn
AG1-169 Lone Pine 115 kV 115 4.5 Solar Withdrawn
AG1-170 Lone Pine 115 kV 115 3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.