Lone Pine substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 5 with terminal status (shown grayed).
5 PJM queue filings name Lone Pine as the point of interconnection, all in Nottoway County, VA.
Target commercial operation date as filed: Oct 2021 (5 filings).
Transmission owner as filed: Dominion (5 filings).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-166 | NW-Rocky Ford Solar | 115 | 6 | Solar | Withdrawn | Oct 2021 |
| AG1-167 | NW-Rocky Ford Solar | 115 | 4.5 | Solar | Withdrawn | Oct 2021 |
| AG1-168 | NW-Rocky Ford Solar | 115 | 4.5 | Solar | Withdrawn | Oct 2021 |
| AG1-169 | Lone Pine 115 kV | 115 | 4.5 | Solar | Withdrawn | Oct 2021 |
| AG1-170 | Lone Pine 115 kV | 115 | 3 | Solar | Withdrawn | Oct 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Nottoway County, VA
- Crewe: none active of 2 filed
- Victoria DP-Martin DP: none active of 2 filed