0 active projects totalling 0 MW in the PJM queue, plus 12 with terminal status (shown greyed).

0active projects
0active MW
12total filed
Queue IDProjectkVMWResourceStatus
AE1-168 Victoria-Martin 115 kV 115 90 Solar Withdrawn
AG1-030 Victoria DP-Martin DP 115 kV 115 90 Solar Withdrawn
AI2-244 Victoria DP-Martin DP 115 kV 115 50.3 Solar Withdrawn
AG2-507 Crewe - Victoria DP 115 kV 115 36 Solar Withdrawn
AG1-166 NW-Rocky Ford Solar 115 6 Solar Withdrawn
AG1-215 Fort Pickett 13.2 kV 13.2 5.6 Battery Withdrawn
AG1-345 Crewe 12.5 kV 12.5 4.8 Solar Withdrawn
AG1-167 NW-Rocky Ford Solar 115 4.5 Solar Withdrawn
AG1-168 NW-Rocky Ford Solar 115 4.5 Solar Withdrawn
AG1-169 Lone Pine 115 kV 115 4.5 Solar Withdrawn
AG1-170 Lone Pine 115 kV 115 3 Solar Withdrawn
AF2-399 Crewe 12.5 kV 12.5 1.9 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.